						| Project Log:  Saturday, February 5, 2011 
 I took the weekend off, but I couldn't resist the urge 
						to install one final section of tabbing on the after 
						fuel tank platform.
 
 With the main structural tabbing at the sides now cured, 
						I could safely lie over the platform to install a 
						single-layer section at the aft end, where the platform 
						met the short after bulkhead.  While this tabbing 
						would naturally add a bit of extra support, my main 
						purpose in choosing to install it was to provide a clean 
						corner that wouldn't catch water or debris over the 
						years to come.
 |  
						| 
  |  
						| With a little more time to kill, I checked the fit of 
						the new Cutless bearing that I'd ordered based on my 
						earlier measurements of the stern tube and housing.  
						I'd slightly bent the aft end of the tube during some 
						earlier work, so I straightened that out and slipped in 
						the bearing, which seemed to fit well.  The bearing 
						specifics were 1-1/2" outside diameter, 5" length, and 
						1-1/4" shaft diameter (Johnson/Duramax model "BIND").
 
 |  
						| Total Time Today:  1.25 hours
 |  
						| < 