[ Home Page ]    [ History ]    [ The Project ]

Project Log:  Summary of Phase V

LABOR 5/12/13 - 1/10/14 155.75 Hours
   
#233 masking tape 1", roll 27
#233 masking tape 2", roll 6
#471 fine-line tape, 1/2",  Roll 1
12" roll masking paper 1
120 grit 2" strip, ft 2
120 grit 4" strip, ft 12
16' x 100' roll plastic 1
220 grit 2" strip, ft 1
220 grit 4" strip, ft 94
3 x 100' roll plastic 2
320 grit 2" strip 1
320 grit 4" strip, ft 79
3M foam masking tape, box 1
4200, tube 2
Alexseal 442 Finish Primer Base, Gallon, gray 1
Alexseal 442 finish primer base, gallon, white 1
Alexseal 442 Primer converter, Gallon 1
Alexseal fine filler, oz 4
Alexseal Flag blue topcoat, gallon 1
Alexseal High Build Base, Gallon 2
Alexseal High Build Converter, Gallon 2
Alexseal High Build Reducer, Gallon 2
Alexseal Primer Reducer, Gallon 1
Alexseal Topcoat Converter 1
Alexseal Topcoat Reducer 1
Alexseal wipe-down solvent, gal 2
Brass overlay hinges, pair 16
Candy stripe roller 3
Face shield, disposable 9
Gold Leaf name and hailport 2
Interlux Sand Beige Interdeck, qt 2
Lacquer thinner, gal 1
Masking paper, roll 1
Micron CSC green gallon 1
Nitrile gloves, box 1
Shop vac filter 1
Tack cloth 7

 

< Previous | Next >


The Motorsailer Project
Site design and content ©2010-2015 by Timothy C. Lackey.  All rights reserved.

Please notify me of broken or missing links or other site issues.
You can always find every day's project log links on The Project page.

Questions and comments | Home Page
V1.0 went live on 8/26/10