Project Log:  Saturday, November 20, 2010

Over the past week or so, as time allowed, I managed to complete the specifications and measured drawings for the new tankage--six tanks in all.  Being a student of the pre-computer 80s, and with little interest in and need for fancy (i.e. modern) design techniques, I hand-drew (gasp!) the tankage drawings, knowing full well that any attempts on my part to use one of the widely-available CAD-type programs would end in frustration and unnecessary delays.

I made additional evolutionary changes to the new tankage designs for the engine room.  In an effort to simplify the design and construction, with minimal reduction in effective tank volume, I decided to change the outboard sides of the tanks from three facets (as seen in my cardboard templates of late) to only two.  I thought the extra volume gained from the more complex shape simply wasn't worth it; the two-sided outboard shape followed the shape of the hull closely enough.

With the designs completed, my next step would be to compile the specifications and measured drawings, carefully check the various specs, and send the designs off to one or more tank manufacturers for quotations and final design manipulation as necessary.

Here are the finished designs for the tanks.  Note:  all specifications and information subject to change.

Forward Water Tank
(centerline, forward cabin)


PDF Version:  Click Here


PDF Version:  Click Here

Specifications:

1.  One baffle along longitudinal centerline
2.  8" inspection port on each side of baffle, as shown
3.  All fitting locations to be supplied with flush threads as shown
4.  Supply:  Dip tube in location shown; 1/2" NPT
5.  Fill:  1-1/2" NPT
6.  Vent:  1/2" NPT
7.  Drain:  1/2"NPT

Port Water Tank
(port aft, engine room)


PDF Version:  Click here

Specifications:
1.  Dimensions as shown
2.  Install 8" inspection port as shown
3.  All fitting locations to be flush with specified threads
4.  Drain:  1/2" NPT
5.  Supply:  Dip tube with 1/2" NPT
6.  Fill:  1-1/2" NPT
7.  Vent:  1/2" NPT 

Starboard Water Tank
(starboard aft, engine room)


PDF Version:  Click here

Specifications:
1.  Dimensions as shown
2.  Install 8" inspection port as shown
3.  All fitting locations to be flush with specified threads
4.  Drain:  1/2" NPT
5.  Supply:  Dip tube with 1/2" NPT
6.  Fill:  1-1/2" NPT
7.  Vent:  1/2" NPT 

Aft Fuel Tank
(centerline, engine room)


PDF Version:  Click here

Specifications:

1.  Dimensions as shown
2.  Install longitudinal baffle along tank centerline
3.  Install 8" inspection port on each side of tank top, as shown
4.  All fitting locations to be flush with specified threads
5.  Drain:  install threads for 1/2" NPT on forward lower side of tank
6.  Fuel pickup: copper dip tube with 3/8" NPT threads in location shown
7.  Fuel return:  3/8" NPT threads in location shown
8.  Fuel vent:  1/2" NPT threads in location shown
9.  Fuel fill:  1-1/2" NPT threads in location shown

Note:  tank to meet or exceed all applicable ABYC standards for diesel fuel

Port Fuel Tank
(port forward, engine room)


PDF Version:  Click here

Specifications:

1.  Dimensions as shown
2.  Install longitudinal baffle along tank centerline
3.  Install 8" inspection port on each side of tank top, as shown
4.  All fitting locations to be flush with specified threads
5.  Drain:  install threads for 1/2" NPT on forward lower side of tank
6.  Fuel pickup: copper dip tube with 3/8" NPT threads in location shown
7.  Fuel return:  3/8" NPT threads in location shown
8.  Fuel vent:  1/2" NPT threads in location shown
9.  Fuel fill:  1-1/2" NPT threads in location shown

Note:  tank to meet or exceed all applicable ABYC standards for diesel fuel

Starboard Fuel Tank
(starboard forward, engine room)


PDF Version:  Click here

Specifications:

1.  Dimensions as shown
2.  Install longitudinal baffle along tank centerline
3.  Install 8" inspection port on each side of tank top, as shown
4.  All fitting locations to be flush with specified threads
5.  Drain:  install threads for 1/2" NPT on forward lower side of tank
6.  Fuel pickup: copper dip tube with 3/8" NPT threads in location shown
7.  Fuel return:  3/8" NPT threads in location shown
8.  Fuel vent:  1/2" NPT threads in location shown
9.  Fuel fill:  1-1/2" NPT threads in location shown

Note:  tank to meet or exceed all applicable ABYC standards for diesel fuel
 

Total Time Today: 3 hours

< Previous | Next >


The Motorsailer Project
Site design and content ©2010-2015 by Timothy C. Lackey.  All rights reserved.

Please notify me of broken or missing links or other site issues.
You can always find every day's project log links on The Project page.

Questions and comments | Home Page
V1.0 went live on 8/26/10